New Rig #4. Mast sleeve
New Rig #3. Mast Mount/Mast Base
Tiller Pilot Maintenance
New Rig #2. Shroud Base Rigging
Deck Tent
New Rig #1. Bridle Rigging
Side Decks
New Rig #2. Shroud Base Rigging
Deck Tent
New Rig #1. Bridle Rigging
Side Decks
New Windows
Outboard Service
Tiller Refurbish
Rudder Overhaul
Solar Panel Setup
Battery Installation
Net Maintenance
Life Jacket Safety
Spinnaker Bow Sprit
Tohatsu Extra Long Shaft Outboard
Maintaining Hatches
Sewing and sail Repair
Jib Hanks
Fitting Cleats
VHF + GPS Install
Setting the Jib Flying
Bottom and Topsides Paint
Spinnaker Setup
Tiki 21 Autopilot
Making a New Trampoline
2:1 Peak Halyard
Setting Up the Jib Sheeting Geometry
Beam Lashings
Dyneema Tether and Shackles
Mainsail Cunningham/Downhaul
Jib Downhaul and Rig Tension
Light Air Genoa
Beam Blocks
Soft Pad Eyes (Dyneema)
New Sails
Propeller Pitch and Ventilation
Masthead Halyard Blocks
Stem Repair
Outboard Service
Tiller Refurbish
Rudder Overhaul
Solar Panel Setup
Battery Installation
Net Maintenance
Life Jacket Safety
Spinnaker Bow Sprit
Tohatsu Extra Long Shaft Outboard
Maintaining Hatches
Sewing and sail Repair
Jib Hanks
Fitting Cleats
VHF + GPS Install
Setting the Jib Flying
Bottom and Topsides Paint
Spinnaker Setup
Tiki 21 Autopilot
Making a New Trampoline
2:1 Peak Halyard
Setting Up the Jib Sheeting Geometry
Beam Lashings
Dyneema Tether and Shackles
Mainsail Cunningham/Downhaul
Jib Downhaul and Rig Tension
Light Air Genoa
Beam Blocks
Soft Pad Eyes (Dyneema)
New Sails
Propeller Pitch and Ventilation
Masthead Halyard Blocks
Stem Repair
Dear Little Cat,
ReplyDeleteDo you have plans for the aluminum beams? I'm looking into getting this done and was wondering how you went about this process.
Did you follow the original plans?
Thanks,
Joseph
The beams are exactly to the original plans but in 1/4 aluminum. You could cut out all of the pieces and then get a welder to weld it all together.
ReplyDelete